Leave Your Message

Project Information

detail1emu
Time of signing: December 12th, 2019
Project products: 8mm copper rods
Project capacity: 30000 tons/year
Project equipment:
60 tons of reverberatory furnace 2,
Continuous casting and rolling production line, 4+8 centralized transmission
Take-up...... Double frame cable take-up
Delivery cycle: 6 months

Equipment Production


  • 01 Firebrick
  • 02 Magnesium Brick
  • 03 Continuous Casting Machine
  • 04 Front Traction
  • 05 Rolling Scissors
  • 06 Check Straight Edge Scraping
  • 07 Scouring
  • 08 Mill
  • 09 Continuous Quenching Device
  • 10 Rear Traction
  • 11 Double Frame Closing Pole

After the project was signed on December 12th, it took 60 days to complete the production of the equipment required for the project.

Equipment Production (5)aie
Equipment Production (4)g29
Equipment Production (3)5tp
Equipment Production (12)q7a
Equipment Production (11)lsd
Equipment Production (9)qq9
Equipment Production (5)aie
Equipment Production (4)g29
Equipment Production (3)5tp
Equipment Production (12)q7a
Equipment Production (11)lsd
Equipment Production (9)qq9
Equipment Production (8)0w4
Equipment Production (7)8z6
Equipment Production (5)aie
Equipment Production (4)g29
Equipment Production (3)5tp
Equipment Production (12)q7a
Equipment Production (11)lsd
Equipment Production (9)qq9
Equipment Production (5)aie
Equipment Production (4)g29
Equipment Production (3)5tp
Equipment Production (12)q7a
Equipment Production (11)lsd
Equipment Production (9)qq9

Delivery


Feburary 15th, 2020
The equipment was shipped 63 days after the project was signed.

Deliver Goods (41)hra
Deliver Goods (42)58d
Deliver Goods (44)61u
Deliver Goods (2)fu3
Deliver Goods (5)idp
Deliver Goods (6)wal
Deliver Goods (41)hra
Deliver Goods (42)58d
Deliver Goods (44)61u
Deliver Goods (2)fu3
Deliver Goods (5)idp
Deliver Goods (6)wal
Deliver Goods (7)9t7
Deliver Goods (8)5oi
Deliver Goods (11)hja
Deliver Goods (12)kmu
Deliver Goods (16)fjo
Deliver Goods (17)bhc
Deliver Goods (20)zov
Deliver Goods (37)zqf
Deliver Goods (38)r9r
Deliver Goods (39)moy
Deliver Goods (41)hra
Deliver Goods (42)58d
Deliver Goods (44)61u
Deliver Goods (2)fu3
Deliver Goods (5)idp
Deliver Goods (6)wal
Deliver Goods (41)hra
Deliver Goods (42)58d
Deliver Goods (44)61u
Deliver Goods (2)fu3
Deliver Goods (5)idp
Deliver Goods (6)wal

Installation


Furnace masonry, CCR production line installation
In just 30 days, we successfully completed the masonry work on the two main bodies of the reverberatory furnaces. We then spent 120 days installing and connecting the entire production line.

Install (60)2f0
Install (57)7iq
Install (53)11f
Install (21)xwq
Install (30)oa7
Install (4)pwn
Install (60)2f0
Install (57)7iq
Install (53)11f
Install (21)xwq
Install (30)oa7
Install (4)pwn
Install (35)owr
Install (54)zjh
Install (63)b88
Install (60)2f0
Install (57)7iq
Install (53)11f
Install (21)xwq
Install (30)oa7
Install (4)pwn
Install (60)2f0
Install (57)7iq
Install (53)11f
Install (21)xwq
Install (30)oa7
Install (4)pwn

Commissioning

Test Run

Project Acceptance

Project Information

detail1hg2
Time of signing: March 30th, 2023
Project products: 9.5mm aluminum rods
Project capacity: 12 tons/hour
Project equipment: 2*55T rectangular melting furnaces +2*25T horizontal circular holding furnaces
Delivery cycle: 2 months

Equipment Production


Firebrick
55T rectangular melting furnace, 25T horizontal tilting holding furnace, burner - completed around mid-July. It took 60 days to complete the production of the equipment required for the project.

Equipment-Production1-(9)o7c
Equipment-Production1-(6)087
Equipment-Production1-(7)elx
Equipment-Production1-(1)rvf
Equipment-Production1-(2)hsd
Equipment-Production1-(3)5pa
Equipment-Production1-(9)o7c
Equipment-Production1-(6)087
Equipment-Production1-(7)elx
Equipment-Production1-(1)rvf
Equipment-Production1-(2)hsd
Equipment-Production1-(3)5pa
Equipment-Production1-(4)p0r
Equipment-Production1-(5)hqk
Equipment-Production1-(8)pkq
Equipment-Production1-(9)o7c
Equipment-Production1-(6)087
Equipment-Production1-(7)elx
Equipment-Production1-(1)rvf
Equipment-Production1-(2)hsd
Equipment-Production1-(3)5pa
Equipment-Production1-(9)o7c
Equipment-Production1-(6)087
Equipment-Production1-(7)elx
Equipment-Production1-(1)rvf
Equipment-Production1-(2)hsd
Equipment-Production1-(3)5pa

Delivery


July 27th First shipment, August 12th second wholesale shipment.
Deliver Goods3stf
Deliver Goods3kd6
Deliver Goods31ns
Deliver Goods34qe

Installation


55t Rectangular Melting Furnace
Since November 6th, we have carried out a number of key steps, including thermal brick laying, non-stick aluminum prefabrication and pouring, impervious material pouring, high alumina brick laying, thermal castable, top prefabrication lifting, ceramic fiber blanket installation, thermal castable injection, and installation and welding of the furnace door cover and transmission. The entire construction process went according to plan.

25T Horizontal Tilting Insulation Furnace
Starting from November 6th, 2023, we have successfully completed a series of key steps, including steel shell positioning, ceramic fiber board laying, insulation brick laying, non-stick aluminum prefabrication and pouring below the liquid level, prefabrication above the liquid level, and burner installation. The whole process went according to plan.

Bag Dust Collector
Starting from November 6th, 2023, we have successfully completed the foundation construction and maintenance, followed by the smooth installation and welding of the steel structure, and finally the successful completion of the pipe and control installation. The whole project progressed smoothly and all the tasks of the project have been completed according to plan.

install1-(10)xwb
install1-(11)157
install1-(12)box
install1-(1)x96
install1-(2)dfe
install1-(3)whh
install1-(10)xwb
install1-(11)157
install1-(12)box
install1-(1)x96
install1-(2)dfe
install1-(3)whh
install1-(5)hh4
install1-(6)5u3
install1-(7)i9z
install1-(9)z9p
install1-(10)xwb
install1-(11)157
install1-(12)box
install1-(1)x96
install1-(2)dfe
install1-(3)whh
install1-(10)xwb
install1-(11)157
install1-(12)box
install1-(1)x96
install1-(2)dfe
install1-(3)whh

Commissioning

Test Run

Project Acceptance