Project Information
Time of signing: | December 12th, 2019 |
Project products: | 8mm copper rods |
Project capacity: | 30000 tons/year |
Project equipment: |
60 tons of reverberatory furnace 2,
Continuous casting and rolling production line, 4+8 centralized transmission
Take-up...... Double frame cable take-up
|
Delivery cycle: | 6 months |
Equipment Production
- 01 Firebrick
- 02 Magnesium Brick
- 03 Continuous Casting Machine
- 04 Front Traction
- 05 Rolling Scissors
- 06 Check Straight Edge Scraping
- 07 Scouring
- 08 Mill
- 09 Continuous Quenching Device
- 10 Rear Traction
- 11 Double Frame Closing Pole
Delivery
The equipment was shipped 63 days after the project was signed.
Installation
In just 30 days, we successfully completed the masonry work on the two main bodies of the reverberatory furnaces. We then spent 120 days installing and connecting the entire production line.
Commissioning
Test Run
Project Acceptance
Project Information
Time of signing: | March 30th, 2023 |
Project products: | 9.5mm aluminum rods |
Project capacity: | 12 tons/hour |
Project equipment: | 2*55T rectangular melting furnaces +2*25T horizontal circular holding furnaces |
Delivery cycle: | 2 months |
Equipment Production
Firebrick
Delivery
July 27th First shipment, August 12th second wholesale shipment.
Installation
55t Rectangular Melting Furnace
Since November 6th, we have carried out a number of key steps, including thermal brick laying, non-stick aluminum prefabrication and pouring, impervious material pouring, high alumina brick laying, thermal castable, top prefabrication lifting, ceramic fiber blanket installation, thermal castable injection, and installation and welding of the furnace door cover and transmission. The entire construction process went according to plan.
25T Horizontal Tilting Insulation Furnace
Starting from November 6th, 2023, we have successfully completed a series of key steps, including steel shell positioning, ceramic fiber board laying, insulation brick laying, non-stick aluminum prefabrication and pouring below the liquid level, prefabrication above the liquid level, and burner installation. The whole process went according to plan.
Bag Dust Collector
Starting from November 6th, 2023, we have successfully completed the foundation construction and maintenance, followed by the smooth installation and welding of the steel structure, and finally the successful completion of the pipe and control installation. The whole project progressed smoothly and all the tasks of the project have been completed according to plan.